Authors: K.J. Sibley and D.L. Arsenault
Identifier: 
Download file: https://library.csbe-scgab.ca/docs/journal/39/39_1_69_ocr.pdf
Published in: CBE Journal » CBE Journal Volume 39 (1997)

Download RAW file: https://library.csbe-scgab.ca/docs/journal/39/39_1_69_raw.pdf
DOI:
Description: Operating cost analysis software was developed for a mechanical wild blueberry harvesting operation. It allows growers and harvcs[cr owners 10 cstim,l1c totnl anllual opcr:lIing costs and operation ('omponcill costs. Costs c:m also be calculated on a per hour and per pOllnd h,tr'c~lcd basis. User defined v:lriablc data allow for lhe c
Keywords:
Résumé:
Mots-clés:
Citation: K.J. Sibley and D.L. Arsenault 1997. H-OPCOST: A SOFTWARE PACKAGE FOR ANALYZING THE COSTS OF OPERATING A MECHANICAL WILD BLUEBERRY HARVESTER. Canadian Agricultural Engineering 39(1):69-72.
Volume: 39
Issue: 1
Pages -
Contributor:
Date: 1997
Technical field:
Conference name:
Session name:

Other information:
Type: Text.Article
Format: PDF
Publication type:
Source:
Relation:
Coverage: Canada
Language 1: en
Language 2:
Rights: Canadian Society for Bioengineering
Notes:
Other files: