Authors: Fisk, S.D., Broughton, R.S. And E.R. Norris
Identifier: 
Download file: https://library.csbe-scgab.ca/docs/journal/14/14_2_69_ocr.pdf
Published in: CBE Journal » CBE Journal Volume 14 (1972)

Download RAW file: https://library.csbe-scgab.ca/docs/journal/14/14_2_69_raw.pdf
DOI:
Description: As most subsurface drainage contractors are paid on a per-foot basis, it is important that they realize the source and extent of any delays that interrupt their effective digging time. For the purpose of this study,

Keywords: delays in the operation of subsurface drainage trenching machines
Résumé:
Mots-clés:
Citation: Fisk, S.D., Broughton, R.S. and E.R. Norris 1972. DELAYS IN THE OPERATION OF SUBSURFACE DRAINAGE TRENCHING MACHINES. Canadian Agricultural Engineering 14(2):69-71.
Volume: 14
Issue: 2
Pages 69 - 71
Contributor:
Date: 1972
Technical field:
Conference name:
Session name:

Other information:
Type:
Format:
Publication type:
Source:
Relation:
Coverage: Canada
Language 1:
Language 2:
Rights:
Notes:
Other files: